Office: Mehgaon, Bhind (MP) · Working in Raebareli (UP) and Bhind (MP)+91 62615 40207Get a quote
Heera Enterprises, Civil Construction Contractor
Services

Pipeline and civil work, built to specification.

Jal Nigam pipelines, HDPE laying, electrofusion jointing, village water supply and civil works in Bhind and Raebareli. Here is what each one covers, so you know what to ask for.

Jal Nigam Pipeline Work by Heera Enterprises
Village drinking water lines

Jal Nigam Pipeline Work

Jal Nigam pipeline work is the laying of drinking water lines for government water schemes in villages and towns. Heera Enterprises does the full job in Bhind (MP) and Raebareli (UP): alignment, trenching, laying, valves, house connections, pressure testing and road restoration.

A large part of our work is drinking water pipelines laid under Jal Nigam style schemes. The job usually runs through lived-in village lanes, so the trench is opened in short stretches, the pipe goes in the same day where possible, and the lane is not left dug up for weeks.

We handle the full line: marking the alignment, trenching, sand bedding, laying, valves and chambers, house-connection tees, pressure testing and restoring the road surface. Measurements and test records are kept so the department’s engineer can check the work without chasing anyone.

  • Trenching, bedding and laying
  • Valves, fittings and chambers
  • Pressure testing and commissioning
  • Road and surface restoration
HDPE Pipeline Installation by Heera Enterprises
Long runs, fewer joints

HDPE Pipeline Installation

HDPE pipeline installation is the laying of high-density polyethylene pipes, now the standard pipe for rural water supply in India (made to IS 4984). HDPE does not rust, flexes with the ground and comes in long lengths, so a line has fewer joints and fewer leaks.

HDPE is now the standard pipe for rural water supply, and for good reason. It does not rust, it bends with the ground instead of cracking, and it comes in long lengths, so a village line has far fewer joints than an old GI or DI network.

Our crews lay HDPE from small house-service sizes up to trunk mains. We take care with the bedding and backfill, because most HDPE failures we are called to repair come from stones against the pipe or a trench that was never compacted.

  • Long-run lines with fewer joints
  • Butt-fusion and trench laying
  • Suited to uneven rural terrain
  • Low maintenance, long service life
Electrofusion Jointing by Heera Enterprises
Joints as strong as the pipe

Electrofusion Jointing

Electrofusion jointing joins two HDPE pipe ends inside a coupler that has a heating coil built in. A controlled current melts the pipe and fitting into one piece, giving a leak-free joint as strong as the pipe. It is also the cleanest way to repair a live line.

An HDPE line is only as good as its joints. With electrofusion, a coupler with a heating coil is fitted over the two pipe ends and a controlled current melts them into one piece. Done properly, the joint is as strong as the pipe on either side.

Our operators scrape and clean every pipe end, clamp it straight and let it cool for the full time before anyone moves it. We also do repairs and tie-ins on existing lines, which is often the quickest way to fix a leaking main without digging up the whole street.

  • Controlled-heat fusion couplers
  • Joint integrity checks
  • Repairs and tie-ins to live lines
  • Trained fusion operators
Civil Construction by Heera Enterprises
Buildings, drains, site work

Civil Construction

Heera Enterprises builds the civil works that rural water and village projects need: pump house and overhead tank foundations, community and panchayat buildings, RCC drains, culverts, boundary walls and site levelling, done by the same team that lays the pipeline.

Alongside pipeline work we take on civil jobs that rural projects need: pump house and tank foundations, community and panchayat buildings, RCC drains, culverts, boundary walls and site levelling.

The same team that lays the pipe often builds the structures at either end of it, which saves the client from coordinating two contractors on one site.

  • RCC and masonry work
  • Community and public buildings
  • Roads, drains and site development
  • Quality-checked finishing
Water Supply Projects by Heera Enterprises
Source to household tap

Water Supply Projects

A village water supply project carries water from the source to every house: borewell, rising main, overhead tank, distribution network and household taps. Heera Enterprises can build the whole scheme or only the pending part, and hands over drawings and test records.

A complete village water supply has several parts: the borewell, the rising main to the overhead tank, the tank itself, the distribution network and finally the tap at each house. We can take the whole chain or just the part that is pending.

When the scheme is handed over, the department gets as-laid drawings, test results and a clear list of valves and chambers, so whoever maintains it next knows what is under the ground.

  • Overhead tank civil works
  • Distribution network and house connections
  • Borewell-to-tank pipeline links
  • Handover with documentation
Equipment

Backed by our own machinery

Machinery

Excavators

Trenching to the marked line and depth.

Fusion units

Repeatable electrofusion joints.

Testing kits

Every section proven before backfill.

FAQ

HDPE pipeline and jointing questions

What clients and site engineers ask us most often.

HDPE pipes are joined by heat fusion. Butt fusion heats two pipe ends on a plate and presses them together, and suits long straight runs. Electrofusion uses a coupler with a built-in heating coil, and suits fittings, tight spots and repairs. Small house connections often use compression fittings.

Butt fusion melts the two pipe faces and presses them together, so no fitting is needed. Electrofusion heats a coil built into a coupler or saddle around the pipe. Butt fusion is quicker on long runs; electrofusion works where the pipe cannot be moved, such as tie-ins and live-line repairs.

IS 7634 (Part 2) is the Indian code of practice for laying and jointing polyethylene (PE) pipes for drinking water. The pipes themselves are made to IS 4984, which covers PE pipes for water supply in grades PE 63, PE 80 and PE 100.

A pressure test fills a closed section with water and holds it above working pressure for a set time. If the gauge drops, a joint or fitting is weak. Testing before backfill means the fault is found while the trench is still open and cheap to fix.

Yes. Electrofusion couplers and tapping saddles let us repair a leak or add a branch to a live line by opening only a small pit, instead of digging up the whole street.

Heera Enterprises, based in Mehgaon (Bhind, MP), is a government registered contractor that lays Jal Nigam drinking water pipelines, HDPE lines and electrofusion joints in Bhind district and in Raebareli district of Uttar Pradesh. Call +91 62615 40207.

Get in touch

Need a quote for your site?

Tell us the village, the rough length of line or the structure you need. We will come back with questions or a visit date.

Chat on WhatsApp

Add Heera to your Home Screen

  1. Tap the Share button at the bottom of Safari.
  2. Scroll and choose Add to Home Screen.
  3. Tap Add. The app icon appears on your phone.